Castle Bruce Intake

Conceptualized and built by ACE Engineering Ltd.
Final design calculations by Sorell Consulting Ltd.
Client Name
(Sub-contracted through Farmex Technology – Main Contractor)
Banana Industry Trust
Charles Avenue
Goodwill Road
Roseau
Commonwealth of Dominica

Client Funding
European Development Fund (EDF)

Date of Service
March – June, 2005

The Work Involved

  1. Conceptual design of an environmentally suitable intake to replace consultant proposal post-tender.
  2. Design concept included:
    • Flow over-weir extraction.
    • Use of river material in construction and integration with river bed to reduce
    • impact of built works.
    • Reduction in resource requirement.
    • Reduction in capital cost.
    • Minimal maintenance cost.
    • Reduction in life cycle cost.
    • Construction of intake across river 50 ft wide.