Home
Our Projects
Previous Projects
Other Project Summaries

Other Project Summaries

Project Description

White River Wilderness Resorts – Phase 1
Water resources assessment and preliminary water supply design for a 30-cabin and 20-tent campground site with conference and restaurant facilities
Dolphin Resorts

On-site wastewater system preliminary design for a 28-room resort with clubhouse, restaurant and gift shop facilities
Petite Coulibri Guest Cottages Water purification and wastewater treatment system design for an upmarket 7-cottage resort with restaurant and other facilities

Unity Resorts (Hatton Garden)
Environmental Impact Assessment for a 6-acre, 60-room resort along the Pagua River

Beaubois Gillon Development Extension
Water supply, distribution and drainage design and construction for a 15-acre housing development extension of Beaubois Gillon Development.
Water distribution network design Several other housing developments in Wall House, Check Hall, Salisbury, Picard, St. Joseph and Point Michel

Grand Bay Agricultural Station Irrigation Project
A technical feasibility analysis of proposals to supply the station with irrigation water from DOWASCO’s mains carried out for the Caribbean Agricultural Research and Development Institute.

Sugar Loaf Power Station
Providing consultancy services, including designs, contract procurement and supervision of construction, for Civil Works aspect of the installation of a second 1.6 MW diesel generator for DOMLEC.

Belfast Estates Limited
Design, procurement of materials and construction of water system for a high-standard housing development.

Sunset Bay Beach Club Hotel
Design, specification and installation of UV water treatment system.

Anse A L’iane Dive Lodge
Design, procurement of materials and supervision of a water system involving 5000 ft of supply pipeline and reservoir.

Blue Max Café At Picard
EIA and wastewater collection, treatment and disposal design.

Copthall Riverside Development
Development plan and water supply design for a 16-acre residential development.

Copthall Estate
Proposal to supply the 175-acre Copthall development with potable water and to improve the Trafalgar and Wotten Waven water supplies.

Hampstead Tourism Development Project
Feasibility studies and preliminary designs to supply the 600-bed resort with potable water, and for collection, treatment and disposal of wastewater.

Fort Young Hotel Water Quality
Assessment of water quality status at the hotel. Installation of micro-filtration equipment and ultraviolet sterilizers as backup treatment to municipal water supply.

Roseau Cooperative Credit Union Water Quality
Assessment of water quality status at the four-story office building. Installation of micro-filtration equipment and ultraviolet sterilizers as backup treatment to municipal water supply.

Warner Land Use Plan
Assessment, for study area of 375 acres, of:

  • Hydrological patterns (rainfall and surface flows) of the area and indicate /estimate rainfall levels.
  • Potable water and irrigation requirements for the area
  • Water Resources for provision of potable and irrigation supply water from existing lines and /or alternative sources
  • Soil type, chemical and physical compositions

Hodges Development, Dominica
Design and Construction of roads, drainage and underground utilities for a 6 acre high-standard housing development in Calibishie. Complete in Nov 2003.